Project Mngt Definitions

Project Mngt Definitions

1. Planning (109)

1.1 Research (82)

1.1.1 Study Materials (45)

1.1.2 Pre-Existing Research (27)

1.1.3 Consulting (10)

1.2 Schedule (17)

1.2.1 Meetings (2)

1.2.2 BCWS (15)

1.3 Purchasing (10)

1.3.1 Estimate Quantities (7)

1.3.2 Purchase Materials (3)

1.3.2.1 Hammer

1.3.2.2 Saw

1.3.2.3 Eggs

1.2.3.4 Dowels

1.2.3.5 Glue

1.2.3.6 Connectors

1.2.3.7 Rubber Bands

1.2.3.8 PVC

1.2.3.9 Glue

Engineering

2.1 Design (24)

2.1.1 Launcher (8)

2.1.1.1 Propellent (4)

2.1.1.2 Tube (2)

2.1.1.3 Stand (1)

2.1.1.4 Fit to Egg Holder (1)

2.1.2. Egg Holder (16)

2.1.2.1 Frame (2)

2.1.2.2 Connectors (2)

2.1.2.3 Saddle (11)

2.1.2.4 Fit to Egg Launcher (1)

2.2 Construct (50)

2.2.1 Launcher (25)

2.3.1.1 Build Platform (7)

2.3.1.2 Add Launcher (13)

2.3.1.3 Build Aiming Device (5)

2.2.2 Egg Holder (25))

2.3.2.1 Build Frame (3)

2.3.2.2 Suspenders (11)

2.3.2.3 Saddle (11)

Testing

3.1 Phase 1

3.1.1 Weight (5)

3.1.1.1 Launcher (1)

3.1.1.2 Egg Holder (1)

3.1.1.3 Modify (3)

3.1.2 Durability (7)

3.1.2.1 Launcher (1)

3.1.2.2 Egg Holder (1)

3.1.2.3 Modify (5)

3.2 Phase 2 (14)

3.2.1 Height (1)

3.2.2 Distance (1)

3.2.3 Accuracy (1)

3.2.4 Modify (11)

3.3 Phase 3 (9)

3.3.1 Stability (1)

3.3.2 Reload Time (2)

3.3.3 Ease of Use (1)

3.3.4 Modify (5)

Admin

4.1 Tracking Costs (35)

4.1.1 Wages (17)

4.1.2 Tools (3)

4.1.3 Resources (5)

4.2 Schedule (16)

4.2.1 ACWP (8)

4.2.2 BCWP (8)

4.3 Group Work

4.3.1 Organizational Chart (7)

4.3.2 WBS (36)

4.3.3 PMB (21)

4.3.4 Risk Management Plan (17)

4.3.5 Initial EV Data (25))

4.3.6 Cost Proposal (14)

4.3.7 EVM Plan (10)

4.3.8 Risk Report (16)

4.3.9 Training Plan (10)

4.3.10 Closeout Report (42)